After the implementation of the new 2025 "Administrative Measures for the Import of Electromechanical Products," an engineering machinery importer incurred a 42-day port detention loss due to deviations in the declared power parameters of the drive shaft. This typical case reveals that the role of import equipment agents has shifted from mere logistics services to...Technical Compliance Managementa new phase. This article will deconstructEquipment ImportsKey risk control nodes throughout the entire process.
Analysis of Core Risk Control Module
According to the import equipment inspection data from the General Administration of Customs for January to June 2025, discrepancies in power parameters (31%), lack of safety certifications (28%), and misreported service years of used equipment (19%) constitute the primary sources of customs clearance obstacles. Professional agency services must establish a triple defense system:
Technical Parameter Verification Mechanism
Motor rated power ±5% floating standard
Consistency of Working Pressure with Design Documents for Pressure Vessels
Special Equipment Filing Pre-review
Boiler/elevator equipment must prepare for TSG certification 120 days in advance.
Tracking the Update Cycle of CCC Certification for Explosion-proof Electrical Equipment
2025 Practical Guide to Customs Clearance Operations
After the launch of the new version of the declaration system, the declaration elements for equipment-type goods have been increased.Energy Efficiency LabelandTraceability information of core componentsTwo mandatory fields. A phased declaration strategy is recommended:
Pre-declaration phase (30 days before arrival)
Complete the reporting of non-physical elements.
Obtain the Customs Pre-Review Opinion Letter
Formal declaration phase (within 48 hours after arrival)
Supplement actual arrival data
Synchronously upload the test report.
Differences between the old and new equipment agency schemes
Special attention is required for the import agency of second-hand equipment in 2025.Proof of Years of ServiceNew Regulations:
Manufacturing year ≤ 5 years for equipment
Provide the original factory certificate.
On-site customs inspection of nameplates
Manufacturing age > 5 years for equipment
Attach third-party test report
Safety Performance Evaluation Certificate
Key Points for Constructing a Risk Early Warning System
Professional agencies should establishFour-dimensional Risk Early Warning Model:
Typical Case Database (containing 500+ precedents)
A case study of semiconductor equipment imports demonstrated that by pre-establishing a risk model to identify new energy efficiency regulations for vacuum pumps in advance, the actual customs clearance time was reduced from an estimated 17 days to just 3 days. This confirms the decisive role of systematic risk management in equipment import agency services.